Tender Request for Lion Rock Tunnel Improvement

Postby Nacrad » Sun Feb 12, 2023 3:32 am

Image
Federal Republic of Nacrad
Highways Department

Title: Tender Request for the Improvement of Lion Rock Tunnel and Waterloo Road Flyover


To whom it may concern,

Introduction
The Highways Department has approved of the improvement of the Lion Rock Tunnel, Lion Rock Tunnel Road and Waterloo Road Flyover sections of Oswain State Route 1, which is congruent with National Route 6-17. This route forms a vital connection between Kowloon, Victoria and the rest of the country, and is one of the most utilised roads in the country.

These roads were built in the late 1960s without expectation of such heavy traffic and are currently requiring binightly to nightly repairs. Moreover, the Waterloo Road section is not fully controlled-access. The metropolitan, state and federal governments concur that this road must be improved. As a result, the Highways Department hereby solicits tenders from various construction firms to arrange this project.

Scope of Work
The scope of work for the proposed project is as follows (listed from north to south):
    1. The improvement of Sha Tin Road and Lion Rock Tunnel Road, a partially-elevated two-lane dual-carriageway road, to three lanes in each direction with noise barriers as appropriate.

    2. The widening of Lion Rock Tunnel from two lanes each direction to three lanes each direction.

    3. Improvement of the cloverleaf interchange between Lung Cheung Road and the Lion Rock Tunnel Road, including the widening and straightening of the slip
    lane between Lion Rock Tunnel Road (towards the south), and Lung Cheung Road (towards the east), and the widening of the northbound (uphill) direction of the Lion Rock Tunnel Road. OOC: Remember to flip the driving direction when you look this intersection up

    4. Extension of the Waterloo Road Flyover from its current ending to Princess Margaret Road (i.e., extension of the controlled-access segment from its current ending by about 800 m to Princess Margaret Road)

    5. Improvement of the Waterloo Road Flyover to 3 lanes each direction

    6. Improvement of all new and improved sections to 100 km/h on open sections, and 80 km/h in urban areas or tunnels.

Works Requirements

Work Quality
All proposed engineering work must be conducted in accordance to the Buildings Ordinance, the Highways (Expressways) (Construction and Maintainence) Ordinance, the Environmental Protection (Nacrad) Ordinance and Environmental Protection (Oswain) Ordinance in terms of works quality.

Employment
Of all crew employed, at least 75% shall be Nacradian permanent residents and/or citizens in accordance to the Employment Ordinance.

Time and Impact of Works
Works may be conducted during daytime or nighttime during weekdays and Saturdays. At least one lane in each direction (not counting frontage roads and/or slip roads) must be open in some reasonable way, shape or form at any point during which works are conducted or prepared.
OOC - HRT 19.07.2023
Call me Hannah
Pronouns: She/They

Basically the result of Anglo-Dutch quarrels on who can profit more from Mingsplosion, coming to a retcon near you!

International News: HUNGARY IS OUT: Hungary quits the Warsaw Pact | Greece legalises same-sex marriage
Domestic News: 16 FEB 2024 (FRI) | Year of the Dragon: 10% birth rate boost expected, says Dept. of Health | CSG Resolute departs for ally visit | Highways & Transport Dept. revives M17 Motorway project between Namchon, KX and Samming, LK
Weather: Riverfort 23/27°C | Amoy 19/21°C | Taipei 23/25°C | Namchon 13/26°C


User avatar
Lubiar
Attaché
 
Posts: 74
Founded: Feb 19, 2020
Inoffensive Centrist Democracy

Postby Lubiar » Sun Feb 12, 2023 3:53 am


Image


Third Industries Prime Group Construction (TIPGC) is a subsidiary of the Third Prime Industries Group of Companies, established in 2020 to serve as its construction and real estate development arm. TIPGC is capable of delivering this project because of its financial strength and the exceptional technical quality of its projects, but also because of the way in which it conducts and manages its projects. We are committed to a sustainable development policy which we pursue through strong partnership, outreach and dialogue with all our public and private sector partners.

TIPGC's operations has seen remarkable growth in Nacrad, more recently being awarded the contract for the South Island Line (West) extension by National Rail (Southern) Co. Ltd last May 2022. TIPGC is pleased to submit its proposal to the Highway Department in line with its published requirements for the Lion Rock Tunnel and Waterloo Road Flyover improvement project, the technical details of which are attached to this letter.

We look forward to doing business with your reputable company.

Mr. Armin Chan
Chairman and Chief Executive Officer
Third Industries Prime Group Construction
Scope of Work
The scope of work for the proposed project is as follows (listed from north to south):
    1. The improvement of Sha Tin Road and Lion Rock Tunnel Road, a partially-elevated two-lane dual-carriageway road, to three lanes in each direction with noise barriers as appropriate.

    2. The widening of Lion Rock Tunnel from two lanes each direction to three lanes each direction.

    3. Improvement of the cloverleaf interchange between Lung Cheung Road and the Lion Rock Tunnel Road, including the widening and straightening of the slip
    lane between Lion Rock Tunnel Road (towards the south), and Lung Cheung Road (towards the east), and the widening of the northbound (uphill) direction of the Lion Rock Tunnel Road.

    4. Extension of the Waterloo Road Flyover from its current ending to Princess Margaret Road (i.e., extension of the controlled-access segment from its current ending by about 800 m to Princess Margaret Road)

    5. Improvement of the Waterloo Road Flyover to 3 lanes each direction

    6. Improvement of all new and improved sections to 100 km/h on open sections, and 80 km/h in urban areas or tunnels.

Works Requirements
Work Quality
All proposed engineering will comply with the Buildings Ordinance, the Highways (Expressways) (Construction and Maintainence) Ordinance, the Environmental Protection (Nacrad) Ordinance and Environmental Protection (Oswain) Ordinance.

Employment
At least 75% of regular contractor force shall be comprised of Nacradian permanent residents and/or citizens, of which a projected 15% shall be management-level, as well as subcontractor and suppliers required for the project.

Time and Impact of Works
The published requirement for works (conducted during daytime or nighttime during weekdays and Saturdays) will be complied with. At least one lane in each direction (not counting frontage roads and/or slip roads) will be open for motorists during which time works are conducted or prepared.

Financial Cost
We estimate the cost of the Proposed Project, which includes the cost of the associated site investigation works, to be NSD $351 million, which will include TIPGC's costs for the required engagement of consultants in order to undertake the first stage design, site investigation works and relevant works supervision in view of the complexity and multi-disciplinary nature of the project
Lubiar
"Our prosperity is our strength"


The Trade Zone Program of Lubiar

The Lubiarian Bank
Open an account with us today!

User avatar
Nacrad
Ambassador
 
Posts: 1449
Founded: Jan 16, 2020
Left-Leaning College State

Postby Nacrad » Mon Apr 10, 2023 10:43 pm

Image
Federal Republic of Nacrad
Highways Department

RESTRICTED

Title: Tender Request for the Improvement of Lion Rock Tunnel and Waterloo Road Flyover


Dear Mr. Chan,

We are pleased to inform you that, lacking other more meritorious tenders, we will award TIPGC the contract for the Lion Rock Tunnel and Waterloo Road Flyover Improvement Project. Should you accept our proposed payment plan, the cost of $351 million will be paid in full by us and by the Commonwealth of Oswain Department of Transport (OSDOT), where we will pay $177,109,935 and OSDOT $173,890,065. The cost will be paid by bank wire through the Bank of East Asia in Nacradian Dollars, using the exchange rate of N$0.8116 = NSD$1 as on 11 April 2023.

Please write back on or before 28 April 2023 to indicate your acceptance of our payment plan, or suggest a different one.

Yours,
Highways Department, Federal Republic of Nacrad
OOC - HRT 19.07.2023
Call me Hannah
Pronouns: She/They

Basically the result of Anglo-Dutch quarrels on who can profit more from Mingsplosion, coming to a retcon near you!

International News: HUNGARY IS OUT: Hungary quits the Warsaw Pact | Greece legalises same-sex marriage
Domestic News: 16 FEB 2024 (FRI) | Year of the Dragon: 10% birth rate boost expected, says Dept. of Health | CSG Resolute departs for ally visit | Highways & Transport Dept. revives M17 Motorway project between Namchon, KX and Samming, LK
Weather: Riverfort 23/27°C | Amoy 19/21°C | Taipei 23/25°C | Namchon 13/26°C



Return to Global Economics and Trade

Who is online

Users browsing this forum: No registered users

Advertisement

Remove ads