Trans Atlantic Rail Line
Welcome to the future! After 11 years of grueling construction, a Trans Atlantic Rail Line has been completed. The central line goes from Brazil to South Olpen to Sanhana to Meretica. A number of tributary lines are also being constructed, with plans to connect to Nova Catania as well. The tunnels of the line are magnetized to maximum speed, but more importantly it is airtight, meaning their is no air resistance. With these factors the train can move astonishing speeds of Moch 3 and above. However, because the train would be easily used for an invasion, it is rigged by bombs in case of war. Their are also guards at each connection to defend against troops entering.
Application for connection
- Code: Select all
[b]Nation Name:[/b]
[b]Leader:[/b]
[b]Do you have a good economy?:[/b]
[b]Are you democratic?:[/b]
[b]Do you agree to allowing Olpenese troops to guard the station?:[/b]
[b]Will you be paying for it or us?:[/b]
[b]If you are building it, will you take out a loan?:[/b]
[b]Where will the station be?:[/b]