The establishment of a pan regional railway company in 2013, allowed Orbis to become a key supplier for high speed stock, and Astyrail. They also began developing equipment for the 2E2-9 high speed train, and the new IC-X series train.
In July 2014, Orbis Rail Systems buys a share of Green Electric Railway company, buying aproximately 25% of the company, a sum worth $300,000,000, this brings a two large rail equipment production companies together.
To cope with a raise in demand tow that we have opened to the export market, Orbis has opened a new production facility located in South Sands, close to the port and power station complex, this allows newly built locomotives to be loaded directly onto ships at the factory rather than to be hauled across country to a port to be loaded and shipped out. Individual orders, depending on product and weight can be shipped by air athough there is a 15% surcharge on the order for air shipment of product. Please note that ICX, R500 and 2E2-9 full HST consists, Interstar and Capestar trains can not be air lifted.
When it comes to emissions from our products, such as the 2D2-M diesel multiple unit, Orbis Rail Systems has worked to ensure that they conform to tight emissions standard, with the smaller diesel engines, such as the 16 litre inline 6 cyliner units used in the 2D2-M series multiple unit, are fitted withg EGR as well as Adblue technology, reducing their NoX emissions and particulate emissions, whilst enhanced muffler and engine mount technology works to make these sets quieter.
At the front of the storefront you will find information about the basic specifications of our products, to find out more, click on the image to view the product in greater detail. Please state in full detail as to your exact requirements in order to ensure that the product you order is correct to your requirements.
Discounts: Orders over 10,000,000 get a 5% discount (10% for Astyria). Orders over 1,000,000,000 qualify for a 20% discount (25% for Astyria). High Speed Trains take 20 days to contstruct, Locomotives take aproximately 7 days to construct, DMU classes take 5 days to construct, please allow up to 14 days after this period for shipping to your nation.
One liners will be considered SPAM and treated accordingly.
Here can be found the Orbis Rail Systems high speed products. Each of these products is capable of cruising at over 300km/h whilst offering passengers a high degree of comfort and safety with many features on board these trains normally the preserve of long haul airliners, such as seat back video screens.
Whether you require electric or diesel power, or even modern steam power for those who do not have diesel or electric infrastructure, or simply want something to bring in the tourists as many nations have noticed that steam trains bring in the tourist dollars, Orbis locomotives are designed to to be tough and durable with the ability to haul large loads over challenging terrain
Orbis commuter trains, powered by either overhead power, third rail power or an onboard diesel power source offer flexibility and efficiency, with the ability to operate as true multiple units with one driver able to control 2 or more trains.
There are networks that due to geographic and financial reasons do not have standard gauge, instead using smaller cape-gauge, or even meter gauge, as such Orbis caters for that too with our Cape range of products, these products are designed for 1067mm Cape Gauge, bringing main line standards of traction, comfort and safety to narrow gauge systems