NATION

PASSWORD

Armstrong Construction - You Dream it. We Build it.

A meeting place where national storefronts can tout their wares and discuss trade. [In character]

Advertisement

Remove ads

User avatar
Cesken
Attaché
 
Posts: 95
Founded: Mar 28, 2018
Ex-Nation

Postby Cesken » Sun Feb 10, 2019 10:39 am

Armstrong Quote

For: GOVERNMENT OF CESKEN


Please review this quote. The price and time frame represent our best estimate given the request you have provided. Please note that any future changes you request are likely to change one or both numbers. Should you accept, please sign and date at the bottom of this quote.

Date Requested: 02/09/2019
Project: Infrastructure and Economy
Construction Time Frame: Six Years, Six Months
Construction To Begin: Four Month
Estimated Project Cost: $1.900,875 Trillion

Signature: _____Emperor Erich von Eisenfaust______ Date: _____2/10/19_____

User avatar
Lesser Bavaria
Lobbyist
 
Posts: 23
Founded: Dec 29, 2018
Ex-Nation

Postby Lesser Bavaria » Sun Feb 10, 2019 5:48 pm

Image
The Kingdom of Lesser Bavaria



Lesser Bavarian Royal Construction Committee

Committee Head Lyon Breytenbach

Image

The King of Lesser Bavaria has announced his intentions to have built a new Winter Palace near the city of Terstein in Lesser Bavaria. Traditionally the role of constructing Palaces, Castles and Estates for the King has fallen to the Lesser Bavarian Royal Construction Committee, which has existed for roughly a hundred and twenty years. Currently the King has three Palaces throughout the country, a Winter Palace and two Summer Palaces. It is our regret to say that the older of the two Palaces has fallen into disrepair after several decades of mismanagement. It has been demolished but tradition has it that the King have three residences, thus there is a need for the building of a new Summer Palace.

After lengthy discussion, myself and the other thirty members of the LBRCC have come to the decision that the building would be best done by a private company. While the Kingdom can pay a heavy price for the Palace, we firmly believe that the job can be done faster and cheaper by a foreign company than by our native contractors. We would like to therefore request the Armstrong Construction Company to build our new Palace outside the city of Terstein, in a pre-determined location. Our own estimates place the cost of constructing the Palace at around 4,500,000,000, we are willing to allocate roughly 5,500,000,000 to the Project, should Armstrong Construction agree to our offer.

Our specifications are as follows.
*Approximately 5 Floors
*815,000 Square Feet in Floor Space
*353 Rooms | 192 Staff Bedrooms, 41 Offices, 64 Bathrooms, 42 Principal Bedrooms and 14 State Rooms.
*Stables, Post Office, Infirmary, Swimming Pool, Gardens, Aviary, Astrological Tower, Private Cinema, Kennel, Music Room, Art Gallery, Throne Room and Dining Hall.
*Traditional Designs

User avatar
Beloura
Envoy
 
Posts: 267
Founded: Nov 02, 2018
Ex-Nation

Postby Beloura » Wed Feb 13, 2019 11:28 am

ViZion wrote:
(Image)
You Dream It. We Build It.


Junior Deputy Assistant Minister #0027,

I am glad to hear back! We look forward to starting your project in one month from now.

Thank you,

Caroline Northrup
Armstrong Construction Director of Global Sales




(Image)
You Dream It. We Build It.


João Peixoto,

I would like to thank you for your interest in Armstrong Construction. We would be pleased to handle this project, however before we can give you a quote, we need more information on what exactly you're looking for us to build beyond 'underground stations' - without knowing what these are, how large they are, requirements, and so forth we cannot begin to give you a proper quote.

Please reach back to us with further information.

Thank you,

Caroline Northrup
Armstrong Construction Director of Global Sales



Autoridade Regional para as Infrastructuras

From. João Peixoto, Regional Minister for Infrastructures of Beloura (a colony of Reino do Brazil)
To. Armstrong Construction
Ref. Leiria Underground

Mrs Northrup

Thank you for your reply. Please find some guidelines for the project bellow.

- Annual passenger numbers 1.35 billion (expected)

- Length of network 402km

- Average train speed 33kph

- Total number of passenger escalators 440

- Total number of passenger lifts 188

- Step-free stations 77

Tank you for your attention at we are at your disposal for any further queries.

Faithfully

JPeixoto

User avatar
Technoscience Leftwing
Diplomat
 
Posts: 803
Founded: Jan 24, 2019
Democratic Socialists

Postby Technoscience Leftwing » Mon Mar 18, 2019 9:04 am

Image

Dear leaders of Armstrong Construction, is it possible to place an order for the construction of a small monorail in our capital Futurograd? A monorail on an overpass, enclosed in an organic glass pipe, is required. And also three stations for this road: near the university center, the park and the residential area.

In the case of a positive response, experts will arrive from us with project documentation to clarify the specific numbers used construction materials, estimates, etc.

Respectfully,
Karl Bakunin, economic assistant. Image
* TLC Factbook
* Goal: increase comfort, technical capabilities and knowledge for most people.
* Pro: technicalism, social equality, cosmopolitanism, scientific atheism, revolutionism, emancipation.
* Contra: technophobia, reactionary despotism, nationalism, religion, ascetic regulation, traditionalism, patriarchality.
* Real location: Russia. Sorry for mistakes in English. Всем салют!

User avatar
ViZion
Powerbroker
 
Posts: 8863
Founded: Antiquity
Anarchy

Postby ViZion » Mon Sep 18, 2023 8:10 pm

Image
You Dream It. We Build It.


João Peixoto,

Thank you for providing the required information! With that, we are able to provide you the estimate below.

Please see the attached quote.

Thank you,

Caroline Northrup
Armstrong Construction Director of Global Sales

Image Attachment File

Armstrong Quote

For: GOVERNMENT OF BELOURA


Please review this quote. The price and time frame represent our best estimate given the request you have provided. Please note that any future changes you request are likely to change one or both numbers. Should you accept, please sign and date at the bottom of this quote.

Date Requested: 09/18/2023
Project: Leiria Underground Station
Construction Time Frame: Two Years, Nine Months
Construction To Begin: Six Month
Estimated Project Cost: $129.75 Billion

Signature: __________________________ Date: _________________





Image
You Dream It. We Build It.


Karl Bakunin,

Thank you for reaching out to us. In order to provide you a quote, we will need some further information such as the length of the monorail system and how many stops. When you provide us that information, we can quote you!

Thank you,

Caroline Northrup
Armstrong Construction Director of Global Sales
The Constitutional Federal Republic of ViZion

[ Angola | Zambia | Tanzania | Antarctica | ViZion Island | Northern South America | Central America | Astyria | Coulter Bay | 18,546,524.5 sq mi ]
(Founded June 14, 2003)
Astyria | Astyria GE&T Directory | The Astyrian Network

User avatar
Reino do Brazil
Negotiator
 
Posts: 6464
Founded: Jan 31, 2013
Inoffensive Centrist Democracy

Postby Reino do Brazil » Thu Sep 21, 2023 4:46 am

Image


Ref Dam

The politics of Reino do Brazil is always towards the implementation of green energy. The basin of the Amazon River has a perfect spot to build a dam with 750 metres of widht. We would like to have a quote for the building of this project. We also need five turbines of high production of electricity; we are not sure if you provide that kind of equipment.
Lokking for your reply.

Sincerely
Joao Monteiro,CEO Clean Energy

User avatar
Bigpipstan
Ambassador
 
Posts: 1235
Founded: Apr 21, 2020
Left-wing Utopia

Postby Bigpipstan » Thu Sep 21, 2023 7:13 am

From: Emperor Bigpip
To: Armstrong Construction
"Good day or night on behalf of the central government and our people. We wanted to negotiate a deal regarding construction of education facilities in an underdeveloped part of Anocratic empire. There are 288 thousand people in need of state provided education. We wanted a monetary estimate of how much would the construction cost, so that the demand for 288 thousand people future students could be met. We intend to take a loan for this project, since having bigger educated workforce should pay for itself."
Image
Last edited by Bigpipstan on Thu Sep 21, 2023 10:51 am, edited 1 time in total.
Anocratic empire is a My little pony X Rimworld nation. Neo-Harmonist Semi constitutional monarchy with a voucher economy. canon population is 3,661,422,794. Doesn't use NS stats anymore. Our TF storefront, Acrab news, RP region, Tales 1, Tales 2.

User avatar
ViZion
Powerbroker
 
Posts: 8863
Founded: Antiquity
Anarchy

Postby ViZion » Mon Sep 25, 2023 7:35 pm

Image
You Dream It. We Build It.


Joao Monteiro,

Thank you for reaching out to us. In order to provide you a quote, we will need some further information - specifically the power output desired. That will dramatically impact the requirements for this dam and the total cost associated. Once we know this, we can get you a quote.

Thank you,

Caroline Northrup
Armstrong Construction Director of Global Sales




Image
You Dream It. We Build It.


Emperor Bigpip,

Thank you for reaching out. Depending on the areas needs and population, the sizes and cost of individual schools will vary dramatically. However, with that said we have an average 1,000 student capacity overall, meaning 288 schools between elementary, middle, and high school plus some K-12 schools. The estimated price is a total for all schools combined.

Please see the attached quote.

Thank you,

Caroline Northrup
Armstrong Construction Director of Global Sales

Image Attachment File

Armstrong Quote

For: GOVERNMENT OF BIGPIPSTAN


Please review this quote. The price and time frame represent our best estimate given the request you have provided. Please note that any future changes you request are likely to change one or both numbers. Should you accept, please sign and date at the bottom of this quote.

Date Requested: 09/25/2023
Project: Nationwide School System
Construction Time Frame: Two Years, Two Months
Construction To Begin: Five Month
Estimated Project Cost: $4.8 Billion

Signature: __________________________ Date: _________________
The Constitutional Federal Republic of ViZion

[ Angola | Zambia | Tanzania | Antarctica | ViZion Island | Northern South America | Central America | Astyria | Coulter Bay | 18,546,524.5 sq mi ]
(Founded June 14, 2003)
Astyria | Astyria GE&T Directory | The Astyrian Network

User avatar
Bigpipstan
Ambassador
 
Posts: 1235
Founded: Apr 21, 2020
Left-wing Utopia

Postby Bigpipstan » Tue Sep 26, 2023 6:55 am

From: Emperor Bigpip
To: Armstrong Construction
"Very well, we will go throught with the deal, taking out a loan for the project as previously stated."

Financing Application via Compass International Bank & Finances
Nation Name: Anocratic empire
Business or Government Applicant Name: Central government
Representative: Emperor Bigpip
Have You Used a Loan Before: no
If You Have, How Good is Your Nation's Credit:
Amount to Finance: $4.8 Billion
Term Length, Check One:
[ ] 12 months
[ ] 24 months
[ ] 36 months
[ ] 48 months
[ ] 60 months
[ ] 72 months (Only for businesses, persons, or governments with no, good, or perfect credit)
[ ] 84 months (Only for businesses, persons, or governments with no, good, or perfect credit)
[ ] 96 months (Only for businesses or governments with no, good, or perfect credit)
[ ] 108 months (Only for governments with no, good, or perfect credit)
[✓] 120 months (Only for governments with no, good, or perfect credit)
Image
Anocratic empire is a My little pony X Rimworld nation. Neo-Harmonist Semi constitutional monarchy with a voucher economy. canon population is 3,661,422,794. Doesn't use NS stats anymore. Our TF storefront, Acrab news, RP region, Tales 1, Tales 2.

User avatar
ViZion
Powerbroker
 
Posts: 8863
Founded: Antiquity
Anarchy

Postby ViZion » Sat Nov 04, 2023 2:24 pm

Image
You Dream It. We Build It.


Emperor Bigpip,

We are delighted to inform you that your loan request for $4.8 billion has been approved by our board of directors. This is a great opportunity for us to collaborate with you on building the finest schools in the galaxy.

We will begin construction in five months, as per your specifications. We estimate that the total completion of all schools will be finished after two years and two months from the start of construction. This timeline is based on our previous experience and expertise in similar projects.

Please let us know if you have any questions or concerns regarding the loan agreement, the construction plan, or any other aspect of this partnership. We are always ready to assist you and provide you with the best service possible.

Thank you for choosing Armstrong Construction as your trusted partner in this endeavor. We look forward to working with you and making your vision a reality.

Caroline Northrup
Armstrong Construction Director of Global Sales
The Constitutional Federal Republic of ViZion

[ Angola | Zambia | Tanzania | Antarctica | ViZion Island | Northern South America | Central America | Astyria | Coulter Bay | 18,546,524.5 sq mi ]
(Founded June 14, 2003)
Astyria | Astyria GE&T Directory | The Astyrian Network

Previous

Advertisement

Remove ads

Return to Global Economics and Trade

Who is online

Users browsing this forum: Aquitayne

Advertisement

Remove ads