NATION

PASSWORD

Tender Request for the South Island Line Western Extension

A meeting place where national storefronts can tout their wares and discuss trade. [In character]
User avatar
Nacrad
Ambassador
 
Posts: 1449
Founded: Jan 16, 2020
Left-Leaning College State

Tender Request for the South Island Line Western Extension

Postby Nacrad » Wed Sep 22, 2021 11:22 pm

Dear Perspective Business Partners,

The Pearl River Delta (Oswain) Transit Authority is looking to extend the South Island Line from its current termini in either Aberdeen or South Horizons to the State University Station.

The South Island Line is currently a medium-capacity railway system with a rail gauge of 1,435 mm (Standard Gauge), using Standard Car No.3 produced by Pearl Heavy Industries. It can carry 85,000 passengers per direction per hour at its peak. The current system has stations at Admiralty (also a transfer station with the East Rail Line, Island Line and Tsuen Wan Line), Happy Valley,Ocean Park and Wong Chuk Hang, where it splits to form one spur towards Aberdeen, and the other towards Ap Lei Chau (South Horizons).

Upon the petition of the Aberdeen County Council, Central and Western Borough Council and the Oswain State University Students' Union, the South Island Line is to be extended with the following additional intermediate stations:
  • Wah Fu Station: This is expected to serve mainly the residents of Wah Fu (I) and (II) Estates. The stations should be located near the border between the two estates, so as to service the most residents.
  • Queen Mary Hospital Station: This is expected to serve Queen Mary Hospital, the top-level triage and treatment hospital in the state. Additionally, this station will also serve students of the Oswain State University who either reside in R.C. Lee Hall, Wai Lun Hall or Lee Hysan Hall, or taking courses in the Medical Campus of said university.

If your tender proposes extension of the Ap Lei Chau Spur, i.e. extension from South Horizons, please note that the crossing of the Aberdeen West Typhoon Shelter must be made underground, and crossing by viaduct is not permitted due to county policy.

Additionally, as the Oswain State University contains buildings whose age exceed 100 years and are declared monuments, care must be taken so as to prevent damaging the historical buildings. It is preferable that the platforms be placed directly below the existing Island Line platforms (70 meters below ground), such that transfer can be facilitated easily.

Please submit your tenders with the duly completed form attached below in person at the drop boxes at our offices, or by mail to the following address:
Pearl River Delta (Oswain) Transit Authority
167 Queen's Road Central
Central and Western Borough
Portsville Province
Commonwealth of Oswain 2XA-1844
Nacrad
(Attn: Tenders and Acquisition Dept.)


Sincerely,
Jacob Kam
CEO of Pearl River Delta (Oswain) Transit Authority

Application form:
Code: Select all
[b]Name of Company:[/b]
[b]Company Website:[/b]
[b]Nation of Origin:[/b]
[b]Proposed Length of Construction (excluding land acquisition):[/b]
[b]Proposed Budget:[/b]
[b]Number of Labourers:[/b]
[b]Number of Administrative Staff:[/b]
[b]Of the above, number or proportion of Nacradians employed:[/b]
[b]Any Special Requests:[/b]
Last edited by Nacrad on Sat Sep 25, 2021 9:12 am, edited 3 times in total.
OOC - HRT 19.07.2023
Call me Hannah
Pronouns: She/They

Basically the result of Anglo-Dutch quarrels on who can profit more from Mingsplosion, coming to a retcon near you!

International News: HUNGARY IS OUT: Hungary quits the Warsaw Pact | Greece legalises same-sex marriage
Domestic News: 16 FEB 2024 (FRI) | Year of the Dragon: 10% birth rate boost expected, says Dept. of Health | CSG Resolute departs for ally visit | Highways & Transport Dept. revives M17 Motorway project between Namchon, KX and Samming, LK
Weather: Riverfort 23/27°C | Amoy 19/21°C | Taipei 23/25°C | Namchon 13/26°C


User avatar
Nacrad
Ambassador
 
Posts: 1449
Founded: Jan 16, 2020
Left-Leaning College State

Postby Nacrad » Fri Sep 24, 2021 10:37 am

bump
OOC - HRT 19.07.2023
Call me Hannah
Pronouns: She/They

Basically the result of Anglo-Dutch quarrels on who can profit more from Mingsplosion, coming to a retcon near you!

International News: HUNGARY IS OUT: Hungary quits the Warsaw Pact | Greece legalises same-sex marriage
Domestic News: 16 FEB 2024 (FRI) | Year of the Dragon: 10% birth rate boost expected, says Dept. of Health | CSG Resolute departs for ally visit | Highways & Transport Dept. revives M17 Motorway project between Namchon, KX and Samming, LK
Weather: Riverfort 23/27°C | Amoy 19/21°C | Taipei 23/25°C | Namchon 13/26°C


User avatar
Texkentuck
Ambassador
 
Posts: 1220
Founded: Jan 17, 2021
Ex-Nation

Armored Train for Transportation and possibly defense?

Postby Texkentuck » Fri Sep 24, 2021 10:16 pm

Name of Company: Texkentuck Defense Department
Company Website:https://forum.nationstates.net/viewtopic.php?f=6&t=510308
Nation of Origin: Texkentuck Monarchy Republic Federation
Proposed Length of Construction (excluding land acquisition):2 years
Proposed Budget: 1,000,000,000 by the Texkentuck Treasury Department
Number of Labourers:2000
Number of Administrative Staff:100
Of the above, number or proportion of Nacradians employed: All Laborer's will be of your nation and the train only requires assembly. The staff will over see the project and pay $30.00 NSD/per hour.
Any Special Requests: Our armored train will carry supplies secured for your nation or can just carry people. We have armored luxary box cars that is for basic citizens. Our nation is devoted to making average citizens feel like first class. With permission would you allow for our nation to add the defense capability of a missile launch pad to a box car?
Last edited by Texkentuck on Fri Sep 24, 2021 10:27 pm, edited 5 times in total.

User avatar
Nacrad
Ambassador
 
Posts: 1449
Founded: Jan 16, 2020
Left-Leaning College State

Postby Nacrad » Mon Sep 27, 2021 7:24 am

bump
OOC - HRT 19.07.2023
Call me Hannah
Pronouns: She/They

Basically the result of Anglo-Dutch quarrels on who can profit more from Mingsplosion, coming to a retcon near you!

International News: HUNGARY IS OUT: Hungary quits the Warsaw Pact | Greece legalises same-sex marriage
Domestic News: 16 FEB 2024 (FRI) | Year of the Dragon: 10% birth rate boost expected, says Dept. of Health | CSG Resolute departs for ally visit | Highways & Transport Dept. revives M17 Motorway project between Namchon, KX and Samming, LK
Weather: Riverfort 23/27°C | Amoy 19/21°C | Taipei 23/25°C | Namchon 13/26°C


User avatar
Syndic Australia
Envoy
 
Posts: 336
Founded: Sep 12, 2020
Left-wing Utopia

Postby Syndic Australia » Mon Sep 27, 2021 8:18 am

*******
*******
****
*******
The Commonwealth of Syndic Australia
"An am fìrin a unsiač, nì Astrālēa adhartas - In truth and solidarity, Australia advances"




To the Pearl River Delta (Oswain) Transit Authority
167 Queen's Road Central
Central and Western Borough
Portsville Province
Commonwealth of Oswain 2XA-1844
Nacrad
(Attn: Tenders and Acquisition Dept.)

From the Special Committee of International Development of the Federal Cabinet, September 27° 2024


The open tender for the expansion of Nacrad's South Island Line has been deliberated upon by the Committee and it has been decided that the Commonwealth will elect to submit an application to pursue said tender, in the interest of international cooperation and mutual benefit. The application is as follows:

Name of Company: The Australic F.C.S.T. (Federal Consolidated Syndicate for Transportation) and F.C.S.I. (Federal Consolidated Syndicate for Infrastructure)
Company Website: N/A
Nation of Origin: Australia
Proposed Length of Construction (excluding land acquisition): Depending on the number of approved workers, the F.C.S.I. anticipates this project could be completed in between 10 to 14 months. Additional time may be required depending on the geological makeup of the area proposed for the Queen Mary Hospital Station, as a geological survey will have to be conducted to determine the safest method of excavation.
Proposed Budget: This would be dependent on the amount/percentage of materials provided by Nacrad for the project and the ultimate method of excavation. Assuming that all labour and materials will be purchased wholesale by Nacrad, the project is expected to cost between £500,000 and £800,000 ADP (approx. $5-8 million NSD), not counting the cost of any compulsory land acquisition that may need to be undertaken by the government of Nacrad. Depending on how much of the labour and resources will be domestically sourced and/or are already stockpiled, these costs may reduce by up to 50%.
Number of Labourers: Between 500 - 800
Number of Administrative Staff: 50 - 80
Of the above, number or proportion of Nacradians employed: Up to 90% of labourer positions and 49% of administrative positions can be earmarked for Nacradic workers.
Any Special Requests: The F.C.S.T. requests that all Nacradic workers on this project be members of the relevant trade union. Furthermore, it is requested that, where Australic workplaces regulations differ from Nacradic ones, the stronger of the two is enforced (i.e. occupational health & safety, remuneration, etc...). This proposal assumes that the expansion will be made from the Aberdeen Terminus.
Last edited by Syndic Australia on Mon Sep 27, 2021 8:20 am, edited 1 time in total.
January 27° - The 2025 Federal Election season has begun! Initial three-party preferred polls put the I.S.P. ahead at 37%, followed by the Country Party at 34%, then Labor at 29%.

⠀⠀ ‎ ‎ ‎ ⠀"In truth and solidarity, Australia advances"
⠀⠀✷ ⠀Australic Consulic Program
⠀⠀⠀Fremantle Intl. Transp. Hub
⠀⠀⠀⠀A.S.I. Portal (Factbooks)

User avatar
Janpia
Powerbroker
 
Posts: 7536
Founded: Jul 20, 2021
Democratic Socialists

Postby Janpia » Mon Sep 27, 2021 8:50 am

To:
Pearl River Delta (Oswain) Transit Authority
167 Queen's Road Central
Central and Western Borough
Portsville Province
Commonwealth of Oswain 2XA-1844
Nacrad

Greetings!,
We have seen your request to extend your railway lines on your South Island Line. The JaRail Group will be happy to extend our railway building expertise to your nation. We are a railway group runned by the state. Here is one of our achievements:

Image

Image

We can also take your request to use your standard 1,435mm gauge to your railway. We hope to see your line running!

- JaRail Union Railway Workers Group

Name of Company:
Janpian Union Railway Workers Group (JaRail)
Company Website:
NA
Nation of Origin:
Janpia
Proposed Length of Construction (excluding land acquisition):
Depending on the length of the line. 50 kilometers can be done in about 9-15 months
Proposed Budget:
Depending on the length and the landscape. 50 kilometers may equal up to 3.06Billion JP / USD
Number of Labourers:
Depending on the length. Normally, 30km railway requires 14,000 workers.
Number of Administrative Staff:
Maximum of 10 railway engineers and 25 tunnel, station and bridge engineers.
Of the above, number or proportion of Nacradians employed:
5,000 workers
Any Special Requests:
NA
Last edited by Janpia on Mon Sep 27, 2021 10:00 am, edited 4 times in total.

Long live the Janpian Union of Revolutionary States!

5th Era
- NS policies ain't real. (No prison policy? HAA)
- Yes. I am your average tankie commie.
- Nation doesn't totally reflect my political views.(Damn you random policies!)
- No. I ain't no FT nation
- Check my military equipments. Worked hard on dem drawings
- Currently trying to improve my RP quality, and improving past pain write-ups
-My favorite past time read. Probably the reference for my deathstar. But I still swear that I'm not an FT nation
- Sometimes I wonder what am I doing with my export program
- Spends majority of my time trying to fix my grammar at factbooks or future posts.
Alliances with:
-KTO
-LDO
HomeNewsGeneral InformationMilitaryMapsEmbassyStore

User avatar
Lubiar
Attaché
 
Posts: 74
Founded: Feb 19, 2020
Inoffensive Centrist Democracy

Postby Lubiar » Sun Oct 03, 2021 10:11 pm


Image


Third Industries Prime Group Construction (TIPGC) is a subsidiary of the Third Prime Industries Group of Companies, established in 2020 to serve as its construction and real estate development arm. TIPGC is capable of delivering this project because of its financial strength and the exceptional technical quality of its projects, but also because of the way in which it conducts and manages its projects. We are committed to a sustainable development policy which we pursue through strong partnership, outreach and dialogue with all our public and private sector partners.

TIPGC is pleased to submit its proposal to the Pearl River Delta (Oswain) Transit Authority in line with its published requirements, the technical details of which are attached to this letter.

We look forward to doing business with your reputable company.

Mr. Armin Chan
Chairman and Chief Executive Officer
Third Industries Prime Group Construction
Name of Company: Third Industries Prime Group Construction
Company Website: www.tipgc.lr
Nation of Origin: Lubiar
Proposed Length of Construction (excluding land acquisition): 6 years
Proposed Budget: NSD 2.9 billion
Number of Labourers: This project is expected to boost the local economy and will support around 1,000 jobs, including 90 apprenticeships.
Number of Administrative Staff: 5-11% of projected workforce
Of the above, number or proportion of Nacradians employed: Minimum of 51%, with upward projections available, of the workforce will be opened to Nacradians
Any Special Requests:
Lubiar
"Our prosperity is our strength"


The Trade Zone Program of Lubiar

The Lubiarian Bank
Open an account with us today!

User avatar
Nacrad
Ambassador
 
Posts: 1449
Founded: Jan 16, 2020
Left-Leaning College State

Postby Nacrad » Thu May 26, 2022 11:41 pm

Riverfort Grand Central Railway Station
139 King's Road North
Central Borough
Riverfort, Nacrad 1AC-1091


National Rail (Southern) Co. Ltd.
We Get You There

Subject: Notification of Contract


After deliberation with the Pearl River Delta (Oswain) Transit Authority, the Third Industries Prime Group Construction company of Lubiar has been awarded the contract for the South Island Line (West) extension. National Rail (Southern) congratulates TIPGC, and extends the utmost gratitude to other companies competing for the contract.

We recognise the excellent quality of work conducted by the TIPGC, and wish that the quality is sustained in Nacrad. We look forward to to collaboration with TIPGC.

Signed
Fedrick Ma
CEO of National Rail (Southern) Co. Ltd.;

Dr. Jacob Kam
Chairperson of the Pearl River Delta (Oswain) Transit Authority
Last edited by Nacrad on Thu May 26, 2022 11:42 pm, edited 1 time in total.
OOC - HRT 19.07.2023
Call me Hannah
Pronouns: She/They

Basically the result of Anglo-Dutch quarrels on who can profit more from Mingsplosion, coming to a retcon near you!

International News: HUNGARY IS OUT: Hungary quits the Warsaw Pact | Greece legalises same-sex marriage
Domestic News: 16 FEB 2024 (FRI) | Year of the Dragon: 10% birth rate boost expected, says Dept. of Health | CSG Resolute departs for ally visit | Highways & Transport Dept. revives M17 Motorway project between Namchon, KX and Samming, LK
Weather: Riverfort 23/27°C | Amoy 19/21°C | Taipei 23/25°C | Namchon 13/26°C



Advertisement

Remove ads

Return to Global Economics and Trade

Who is online

Users browsing this forum: No registered users

Advertisement

Remove ads